Chassis assembly of various components and engine / drivetrain installation in preparation for body drop.

12-23-19 Frame Home
Frame is ready for transport from my shop to TIN Restorations in Illinois.

12-23-19 Frame2
Frame loaded ready for the 7 hour trip....

12-23-19 Frame at Shop
Frame has arrived at Chris's shop and now sits next to the painted body ready for assembly process.

1-13-20 Engine1
An issue was found with the rebuilt engine - it was determined the engine needed to be removed and send out for a 2nd rebuild.

1-13-20 Engine3
Engine removed for 2nd rebuild - see Engine Rebuild section for details...

3-8-2020 radiator 1

1-6-20 Tire1
New Auburn Deluxe tires from Diamond Back were mounted to powder coated rims.

1-6-20 Tire2